Project 77
Construction
Owner deleted premium tile allowance (credit)
Project
19 Centre St, Jamaica Plain, MA 02130
Title
Owner deleted premium tile allowance (credit)
Credit
$3,000.00
Status
Incorporated
Subcontractor
Owner-directed
Proposed date
Apr 1, 2026
Approved date
Apr 5, 2026
Owner signature / date
Contractor signature / date
Generated 9/12/2026 — not a substitute for a signed original.